Risk assessment

Risk Assessment 

Date
Hazard
Level of Risk
(Low, Medium, High
Prevention
Issues
20/2/2014
Debris at location
Medium
Make sure area of the location is empty of debris that will cause harm or injury to actors or crew
Some of the actors got hurt by some of the nettle bushes however we moved away from the bushes 

24/02/2014
People interfering with the production
Low
Make sure location and time is right where there are hardly any public around so it doesn’t interfere with filming. i.e. cause actors to loose contraction.
 There was no issue as the locations were the public didn’t go and we got the production done early while no one was really awake.  
24/02/2014
Weather
Medium
Make sure the weather condition is acceptable for production.

Take umbrella in case of rain so characters clothing doesn’t get wet. 

The only issue with the weather was that before production the weather was heavy rain. It stopped before production got called off and thanks to the rain , it created a dull environment which fitted perfectly to the scene.